Knowledge Center

Case study: TOTUS Transformer Monitor saves two 130 kV bushings in Canada

25th April 2022

Evidence: Increase of Power Factor and Partial Discharges in the bushing

Action: Both bushings replaced after offline tests confirmed the online results

Background

Due to federal PCB regulations in Canada, the utility has a targeted transformer bushing replacement program to meet end of use dates in 2025. Typical practice at the company is to install bushing monitors on new transformer HV oil filled bushings and to target older suspect bushings as a retrofit. In this instance the utility was applying a new approach, by adopting a more advanced online monitor, TOTUS, that could measure DGA in main tank as well as Partial Discharge (PD) in both main tank and bushings. The unit was installed to investigate a suspected source of PD in the transformer with the transformer bushings replaced at the same time.

The choice of TOTUS was driven by its unique ability to separate the PD in the tank from those in the bushings, as well as automatically rejecting the noise.


To read more download the full case study

Simply complete the form to access a copy of the case study.