Real time insights that exposed a fast developing bushing defect and enabled safe, controlled replacement.
When faults develop in RIP bushings, issues can escalate rapidly, leaving operators with limited warning before failure. Discover how TOTUS supported a utility to detect and prioritise immediate replacement of the emerging bushing failure.
Challenge
RIP bushings suffer high failure risk
Event
TOTUS detected rising PF & PD
Action
Controlled outage and offline tests
Outcome
Safe replacement, failure prevented