High voltage power transformer

Early Detection and Replacement Saves Two 69 kV Bushings for APAC Utility

Real-time visibility that identified emerging bushing deterioration before it escalated into a critical failure.

A major APAC utility adopted online monitoring to gain deeper visibility into their transformer’s health. TOTUS revealed early warning signs on two 69 kV bushings during a period of heavy loading.  Discover how TOTUS helped the utility detect developing issues on two 69kV bushings and the actions taken to prevent failure and potential outage.

Challenge

Hidden deterioration in critical bushings

Event

TOTUS detected rising PF and PD

Action

Targeted offline testing and replacement

Outcome

Prevented failure and unplanned outage

Early Detection Saves Two 69 kV Bushings for APAC Utility