Intervention that Prevented a €2M Failure for a French Utility
Case Study Download
Real-time monitoring that exposed advanced dielectric ageing.
Challenge
Bushing failure often have catastrophic impacts
Event
TOTUS detected PF rise & thermal linked capacitance
Action
Planned outage and offline testing
Outcome
€9k intervention avoided €2M+ failure