A €9,000 Intervention that Prevented a €2M Catastrophic Failure for a Leading French Utility

Real-time monitoring that exposed advanced dielectric ageing.

A 90 MVA hydro‑connected transformer operated as a critical, non‑redundant asset, where any unplanned outage could cause major service disruption and financial loss. Learn how TOTUS uncovered a developing issue enabling a €9,000 intervention that prevented a multi‑million euro failure.

Challenge

Bushing failure often have catastrophic impacts

Event

TOTUS detected PF rise & thermal linked capacitance

Action

Planned outage and offline testing

Outcome

€9k intervention avoided €2M+ failure

Intervention that Prevented a €2M Failure for a French Utility