How TOTUS BM Helps
What TOTUS BM Delivers
Partial Discharge (PD) Triangle
Highlights the presence, intensity and location of Partial Discharges (PD) in the transformer, using a simple, colour-coded tool.
Automated noise rejection
Applies patented algorithms to detect, identify and automatically reject noise, focusing only on relevant PD activity.
PD fault location accuracy
Separates PD activity in bushings from the main tank, ensuring faster and more accurate fault location, diagnosis and maintenance.
Data trending analysis
Correlates PD activity with critical operating parameters, identifying specific failure modes before they escalate.
Prevent Transformer Failure with TOTUS BM Bushing Monitoring
Gain the insight and early warning you need to protect your transformer bushings from failure. With continuous insulation monitoring and PD detection, you can identify developing faults early, reduce risk and take proactive steps to safeguard asset health.
Get in touch with our team to learn more.
Benefits of TOTUS Bushing Monitor
Safer operations
Detects developing faults before they escalate to explosions or fires—protecting people, assets and operations.
Reduced outages
Minimises downtime with continuous, real-time insights that enable proactive maintenance planning.
Lower costs
Avoids costly emergency repairs and premature asset replacements by using condition-driven maintenance.
Longer transformer life
Protects investments by addressing issues early, maximising asset lifespan and avoiding long lead-time replacements.
Upgrade your monitoring capabilities
How the Partial Discharge Triangle Prevents Transformer Failure
With large amounts of partial discharge monitoring data, asset managers often face the challenge of understanding which transformers are affected by PD.
The PD Triangle provides a simple, colour-coded visual image—showing the presence, intensity and phase of PD activity. This empowers asset managers to quickly identify which transformers have active PD and which are PD-free, for more efficient screening of asset fleets. So, you can focus your time, resources and budgets where they matter most.
Discover how TOTUS prevents 130 kV bushing failure for a leading Canadian utility
Case Study Download
Associated products